August 10, 2026 4:07 am
We are on the other side of a private bridge with seven "neighbors". The concrete truck would not cross it. I had to hand mix 166 80# sacks of concrete for the four primary piers. Fifty sacks in each of the high piers/columns, 33 into each of the lower piers/columns. All four started 5 feet in the ground (no metal cage - I hope that was not a mistake). Then I installed all of the support pipe and crossmembers, all the panels, conduit, electrical. I did all of the drawings, secured all permits, and received permission to turn it on. It has run flawlessly for 8 years now, I wish I had done it with a battery or two.
This topic was modified 2 weeks ago 2 times by High Voltage
Quote
Forum Information
- 33 Forums
- 45 Topics
- 75 Posts
- 0 Online
- 17 Members
Our newest member: islander
Latest Post: Are generators as viable today now with batteries?
Forum Icons:
Forum contains no unread posts
Forum contains unread posts
Topic Icons:
Not Replied
Replied
Active
Hot
Sticky
Unapproved
Solved
Private
Closed